Site – Glasgow International Arena / Sir Chris Hoy Velodrome

Description of works – High-Level Flange Replacements & Structural Maintenance

Location – Glasgow

Service Categories – Industrial Rope Access (Working at Height)

The Glasgow International Arena (formerly known as the Emirates Arena) and Sir Chris Hoy Velodrome represent the pinnacle of Glasgow’s sporting infrastructure. Maintaining the structural integrity of such flagship venues requires a contractor capable of operating at extreme heights without the use of invasive scaffolding or heavy plant.

The Balmore Group’s specialist rope access division was commissioned to execute high-level flange replacements and critical maintenance across these vast internal and external structures. By utilising advanced rigging techniques, our team provided a rapid, surgical maintenance solution that ensured the venues remained operational and safe for world-class competition.